GENERAL SERVICES ADMINISTRATION
FEDERAL SUPPLY SCHEDULE PRICE LIST
ENVIRONMENTAL SERVICES CONTRACT: GS- 10F-0008M
Federal Supply Group-899:  Class F799
SERVICE AREA:  Mid-Atlantic States
CONTRACTOR: SIN 899-8: Remediation Services
SIN 899-99: Introduction New Services
Environmental Management Associates, Inc.      RI/FS - Advanced Field Screening
5303 Route 33/34, Farmingdale, NJ 07727      Systems - Expedited Site
Ph: 732-919-0595  Fx: 732-919-0758      Characterization
DUNS: 929815876   CCR:  02RB4 Contract Date: 10/01/2001 - 9/30/2006
mkneucker@emaenv.com  URL: www.emaenv.com Terms: 2%-10 Days. Govt. VISA Credit Cards
Contact: Michael Kneucker P.E.
SIN 899-8:  REMEDIATION SERVICES SIN 899-99:  SITE INVESTIGATIONS
PROFESSIONAL LABOR RATES: EXPEDITED SITE CHARACTERIZATION
Hourly Day Hour / Day
Professional Engineer $110 $800 ADVANCED FIELD SCREENING SYSTEMS:* $ 350 / 2500
Environmental Engineer 90 700             >Geoprobe Direct Push & Auger System
Geologist/Hydrogeologist 80 600             >On-Site Field Mobile Laboratory
Journeyman Driller 60 450             >2 Technicians (Driller & Lab)
Lab Technician 60 450 Day Rate
Environmental Technician 60 450 Geoprobe Direct Push & Auger System (1) $900
Chemist (1) 65 520 Field (on-site) Mobile Laboratory (1) 1100
Confined Space Entry (1) 60 450 Geotechnical-Conventional Drill Rig (1) 1600
N-2 Systems Operator (1) 60 450 PID (1) 50
Waste Disposal Specialist (1) 50 400 Liquid Injection Equipment (1) 200
Construction Equipment Opr (1) 60 450 Hand Geoprobe Equipment (1) 180
SIN 899-8: REMEDIATION SERVICES
EQUIPMENT & MATERIALS SCHEDULES: MATERIALS: (1)
Day Rate Usage Fee
Service Truck (1) $75 Sheet Plastic $ 80 / roll
Backhoe / Skid Loader (1) 650 Sand, Fill $ 17 / ton
Excavator 18,000 lb (1) 850 Top Soil $ 20 / ton
Excavator 54,000 lb (1) 1250 55 Gallon Drums $ 45 / drum
Mason Dump Truck (1) 225 Sorbent Pads $ 75 / bale
Dump Truck (1) 400 Seeding $ 0.20 / sq ft
Vacuum Truck (1) 720 Sampling / Drilling Equipment Cost + 15%
Vapor Extraction Blower (1) 60 Material / Disposal: Cost + 15%
Generator (1) 50 (Oil, Water, Chemicals, Drums, Debris)
Remediation Systems (1) Cost + 15% Health & Safety Equipment Cost + 15%
SPECIAL EXPENSES: (1)
Notes:
Equipment Rentals, Subcontractor Services & Materials - Cost + 15% (1) Rates are not included in this
Overnight & Per Diem - $ 125 / person Contract.  Contractor prefers to
Level C Labor - $100 / person / day (+) negotiate a 'Lump Sum' quote for
Level B Labor - $150 / person / day (+) projects.
Minimum Labor / Equipment Rate is 4 hours * Advanced Field Screening Systems
Overtime is billed at 1.4 X the hourly rate is a registered Service Mark of EMA